Many of the State Highway Administration (SHA) Intercounty Connector (ICC) Environmental Stewardship and Compensatory Mitigation projects will take place in M-NCPPC parklands. Below is a list of the projects in our parks that will have the greatest impact on public use.

Background

In recognition of the important natural resources that will be affected by the construction of the ICC, a comprehensive package of Environmental Stewardship / Compensatory Mitigation (ES/CM) projects are part of the ICC highway construction. While your community may not be located along the ICC mainline, it may still be identified to benefit from a program that is specifically designed to improve water quality, treat runoff generated from existing developments in the project area, and to restore stream conditions in the watershed.

Links to SHA

Projects in Parks List

There are many ES/CM projects underway for the ICC. Below is a list of the projects that will have the greatest affect on the public use of M-NCPPC Parks in Montgomery County, MD. Here you will find links to materials developed for Public Meetings by SHA and by Parks staff for M-NCPPC Planning Board Mandatory Referral review. If you need additional information, please contact SHA .

The projects are grouped geographically by project number as follows:

NB = North Branch
Project Name / Location / Amenities Affected
Estimated Construction Dates
Public Outreach Materials
NB-1: Stream Restoration Project   Spring 2012 through Summer 2013  
  • North Branch Stream Valley Park - All amenities will remain open.

05-06-10 Public Meeting (pdf)
02-03-11 Planning Board memo - item #2 (pdf) | Video

NB-11: Stormwater Management Pond Retrofit Project   Winter 2012 through Summer 2012  

09-05-10 Public Meeting (pdf)
03-31-11 Planning Board memo - Item #10 (pdf) | Video

NB-3: Stream Restoration Project   Spring 2012 through Summer 2013  
  • Flower Valley Neighborhood Park - All amenities will remain open.  The contractor is permitted the use of a portion of the park's parking lot during working hours, but the remainder of the parking lot will be open for public use.  After 5pm and on weekends, the entire parking lot will be available for public use.  Construction access will be off of Hornbeam Drive, Bitterroot Way, Emory Lane, and Jasmine Drive.

05-0 6-10 Public Meeting (pdf)
02-03-11 Planning Board memo - item #2 (pdf) | Video

back to top

NW = Northwest Branch
Project Name / Location / Amenities Affected
Estimated Construction Dates
Public Outreach Materials
NW-4: Stream Restoration Project   Spring 2012 through Fall 2013  

May 19, 2011 at James H. Blake High School

NW-160: Stream Restoration Project   Winter 2010 through Fall 2012  

04-29-09 Public Meeting (pdf)
07-23-09 Planning Board memo - item #16 (pdf) | Video

NW-170: Stream Restoration Project   Winter 2010 through Fall 2012  
  • Layhill Local Park
    One softball field is closed during construction.  Construction access off of Layhill Local Park parking lot.

04-29-09 Public Meeting (pdf)
07-23-09 Planning Board memo - item #16 (pdf) | Video

PB = Paint Branch
Project Name / Location / Amenities Affected
Estimated Construction Dates
Public Outreach Materials
PB-1: Wetland Creation Project   Winter 2012 through Spring 2013  
  • Peach Orchard/Allnutt
    Construction access will be off of Peach Orchard Road, Spencerville Road, and Timberlake Drive.

05-25-10 Public Meeting (pdf)
03-31-11 Planning Board memo - item #9 (pdf) | Video

PB-8: Stream Restoration Project   Spring 2011 through Summer 2012  

4-14-10 Public Meeting (pdf)
11-4-10 Planning Board memo - item #10 (pdf) | Video

PB-12: Stream Restoration Project   Spring 2013 through Summer 2014  

06-29-10 Public Meeting
TBD

PB-33: Water Quality Project   Spring 2013 through Winter 2014  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Good Hope Drive

5-25-10 Public Meeting (pdf)
TBD

PB-37: Stream Restoration Project   Fall 2011 through Spring 2012  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Bart Drive, Harold Road, and Good Hope Road.
04-14-10 Public Meeting (pdf)
11-4-10 Planning Board memo - item #10 (pdf) | Video
PB-43: New Stormwater Management Pond Project   Winter 2012 through Fall 2012  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Timberlake Drive.

05-25-10 Public Meeting (pdf)
12-16-10 Planning Board memo - item #10 (pdf) | Video

PB-108: Stream Restoration Project   Fall 2011 through Fall 2012  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Hopefield Road, Cradock Street, and Good Hope Road.
04-14-10 Public Meeting (pdf)
11-4-10 Planning Board memo - item #10 (pdf) | Video
PB-109: Stream Restoration Project   Spring 2013 through Spring 2014  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Windmill Lane and Good Hope Road.

06-29-10 Public Meeting (pdf)
TBD

PB-114A: New Stormwater Management Pond Project   Fall 2011 through Spring 2012  

05-25-10 Public Meeting (pdf)
09-30-10 Planning Board memo - item #7 (pdf) | Video

PB-118: Stream Restoration and Biotrench Project   Fall 2011 through Fall 2012  
  • Upper Paint Branch Stream Valley Park
    Construction access off of Countryside Drive.

04-14-10 Public Meeting (pdf)
11-4-10 Planning Board memo - item #10 (pdf) | Video

PB-119: Stream Restoration Project   Spring 2013 through Summer 2014  
  • Peachwood Neighborhood Park
    All park amenities will remain open to the public.  Construction access from the Peachwood Park parking lot and Good Hope Road.

04-14-10 Public Meeting (pdf)
TBD

PB-132: New Stormwater Management Pond Project   Summer 2011 through Winter 2012  

04-14-10 Public Meeting (pdf)
09-30-10 Planning Board memo - item #8 (pdf) | Video

back to top

PR - Reddy Branch SVP / Olney Mill
Project Name / Location / Amenities Affected
Estimated Construction Dates
Public Outreach Materials
PR-257: Wetland Creation & Stream Restoration Project   Summer 2012 through Winter 2013  

09-15-10 Public Meeting (pdf)
11-10-10 / 03-09-11 / 09-14-11

RC = Rock Creek
Project Name / Location / Amenities Affected
Estimated Construction Dates
Public Outreach Materials
RC-2: Stream Restoration Project   Fall 2011 through Fall 2013  
  • Mill Creek Towne Local Park
    During construction, the playground and ball field at Mill Creek Towne Local Park will remain open to the public.  The paved walking trail may be temporarily closed for relocation, but will reopen at the close of construction.  Construction access for Shady Grove Rd., Founders' Mill Dr and Baederwood La.

03-11-10 Public Meeting (pdf)
02-03-11 Planning Board memo - item #2 (pdf) | Video

RC-73: Stormwater Management Pond Retrofit Project   Summer 2012 through Spring 2013  

09-15-10 Public Meeting (pdf)
TBD

RC-74: Stormwater Management Pond Retrofit Project   Summer 2012 through Spring 2013  

09-15-10 Public Meeting (pdf)
TBD

RC-131/131A: Stream Restoration Project   Summer 2011 through Summer 2012  
  • Meadowbrook Local Park
    Construction access off of Meadowbrook Local Park parking lot and off of Beach Drive open space.  Fields 4 and 5 will be closed for the duration of construction; field 6 will be closed initially and scheduled to reopen Fall 2011.

05-11-10 Public Meeting (pdf)
06-17-10 Planning Board memo - item #13 (pdf) | Video

SC - Seneca Creek SVP [ Greenway Trail ?]
SC-2: Wetland Creation & Stream Restoration Project   Summer 2011 through Summer 2012  

05-09-10 Public Meeting (pdf)
06-17-10 Planning Board memo - item #13 (pdf) | Video archive

back to top

Contact SHA

For help in scheduling meetings between your community and the project team and to answer general questions about the ICC environmental mitigation projects. Submit your comments or questions to the project team by email or phone.

back to top - last update: September 29, 2011